Hydro-SaaS
Menu
Demo park — every factory, number and event on these pages is simulated for demonstration.

Park water intelligence

Demo Industrial Park

6 factories · bulk supply + 2 boreholes · central effluent treatment plant · receiving wetland

What needs attention

  • COD load spike at the Park sewer at CETP inlet on 10 Nov, 16:00: 120 kg/h against a usual 24 kg/h. Most likely source: Demo Textiles (84 % of the excess). Trace it →
  • Borehole BH-1: pumping water level is 31.6 m below ground and could reach its safe limit (36 m) in about 37 days at the current trend; specific capacity is down 13 % (possible screen clogging). See drawdown →

Tenants and what they share

Each factory decides what the park operator may see. Its own dashboard stays private.

TenantSectorSharingCOD load
Demo Steel WorksSteel & metal
FlowssharedQualitysharedAlertsshared
41 kg/d
Demo Battery RecyclersBattery recycling
FlowssharedQualitysharedAlertsnot shared
9 kg/d
Demo BeveragesBeverages
FlowssharedQualitysharedAlertsshared
140 kg/d
Demo TextilesTextiles
FlowssharedQualitysharedAlertsnot shared
275 kg/d
Demo FoodsFood processing
FlowssharedQualitynot sharedAlertsnot shared
—
Demo PlasticsPlastics
Flowsnot sharedQualitynot sharedAlertsnot shared
—

Leaving the park

  • Chemical oxygen demand
    Treatment plant (CETP) · limit ≤ 70 mg/L
    41.5 mg/LOK
  • Total suspended solids
    Treatment plant (CETP) · limit ≤ 50 mg/L
    16.7 mg/LOK
  • Lead
    Treatment plant (CETP) · limit ≤ 0.1 mg/L
    0.012 mg/LOK
  • Chemical oxygen demand
    Receiving wetland · limit ≤ 70 mg/L
    42.8 mg/LOK
  • Total suspended solids
    Receiving wetland · limit ≤ 50 mg/L
    18.9 mg/LOK

Checked against the NEMA 2020 effluent standards. The receiving point is shown for context.

Network assets

Intake / bulk supply 1Borehole 2Meter 6Drain / sewer 2Treatment unit 1Receiving point 1Outlet 5Flow links 21