Park water intelligence
Demo Industrial Park
6 factories · bulk supply + 2 boreholes · central effluent treatment plant · receiving wetland
Water in (7-day mean)
2,566 m³/d
100 % of flows metered
Losses & unmetered use
18 %
454 m³/d not reaching sharing tenants
Pollutant load (COD)
732 kg/d
36 % not traced to a sharing outlet
Demand tomorrow
1,497 m³/d
25 °C forecast · ±279 m³
What needs attention
- COD load spike at the Park sewer at CETP inlet on 10 Nov, 16:00: 120 kg/h against a usual 24 kg/h. Most likely source: Demo Textiles (84 % of the excess). Trace it →
- Borehole BH-1: pumping water level is 31.6 m below ground and could reach its safe limit (36 m) in about 37 days at the current trend; specific capacity is down 13 % (possible screen clogging). See drawdown →
Tenants and what they share
Each factory decides what the park operator may see. Its own dashboard stays private.
| Tenant | Sector | Sharing | COD load |
|---|---|---|---|
| Demo Steel Works | Steel & metal | FlowssharedQualitysharedAlertsshared | 41 kg/d |
| Demo Battery Recyclers | Battery recycling | FlowssharedQualitysharedAlertsnot shared | 9 kg/d |
| Demo Beverages | Beverages | FlowssharedQualitysharedAlertsshared | 140 kg/d |
| Demo Textiles | Textiles | FlowssharedQualitysharedAlertsnot shared | 275 kg/d |
| Demo Foods | Food processing | FlowssharedQualitynot sharedAlertsnot shared | — |
| Demo Plastics | Plastics | Flowsnot sharedQualitynot sharedAlertsnot shared | — |
Leaving the park
- Chemical oxygen demandTreatment plant (CETP) · limit ≤ 70 mg/L41.5 mg/LOK
- Total suspended solidsTreatment plant (CETP) · limit ≤ 50 mg/L16.7 mg/LOK
- LeadTreatment plant (CETP) · limit ≤ 0.1 mg/L0.012 mg/LOK
- Chemical oxygen demandReceiving wetland · limit ≤ 70 mg/L42.8 mg/LOK
- Total suspended solidsReceiving wetland · limit ≤ 50 mg/L18.9 mg/LOK
Checked against the NEMA 2020 effluent standards. The receiving point is shown for context.
Network assets
Intake / bulk supply 1Borehole 2Meter 6Drain / sewer 2Treatment unit 1Receiving point 1Outlet 5Flow links 21