Demo park — every factory, number and event on these pages is simulated for demonstration.
Park water intelligence
Pollutant loads
Flow × concentration at every sharing outlet, and which source caused a spike.
Load from sharing outlets
466 kg/d
4 outlets, last 14 days
Measured at sewer
732 kg/d
Park sewer at CETP inlet
Not traced
36 %
of the sewer load has no sharing source
Largest source
59 %
Demo Textiles
Which source caused the spike?
Chemical oxygen demand load at the Park sewer at CETP inlet reached 120 kg/h on Tue 16:00, against a usual 24 kg/h. Each outlet's load above its own baseline, 2 h earlier (sewer travel time), is ranked below.
- 1. Demo Textiles84 %205 kg above baseline
- 2. Demo Beverages11 %26 kg above baseline
- 3. Demo Steel Works4 %11 kg above baseline
- 4. Demo Battery Recyclers1 %2.1 kg above baseline
- 16 % of the excess could not be traced to a sharing outlet.
- Sewer (measured)
- Demo Textiles
- Demo Beverages
- Demo Steel Works
- Demo Battery Recyclers
- Spike at the sewer
Daily Chemical oxygen demand load by source
- Demo Textiles
- Demo Beverages
- Demo Steel Works
- Demo Battery Recyclers
Sources ranked
| Tenant | Flow | Mean conc. | Load | Share | Peak |
|---|---|---|---|---|---|
| Demo Textiles | 455 m³/d | 578 mg/L | 275 kg/d | 59 % | 80 kg/h · Tue 13:00 |
| Demo Beverages | 414 m³/d | 329 mg/L | 140 kg/d | 30 % | 16 kg/h · Wed 14:00 |
| Demo Steel Works | 356 m³/d | 112 mg/L | 41 kg/d | 9 % | 4.4 kg/h · Tue 13:00 |
| Demo Battery Recyclers | 105 m³/d | 84 mg/L | 9.2 kg/d | 2 % | 1.0 kg/h · Fri 13:00 |
Load = flow × concentration (m³/h × mg/L ÷ 1000 = kg/h). Laboratory results are held for 36 h between samples. Not sharing Chemical oxygen demand data with the park: Demo Foods, Demo Plastics.
Reference case · real public data
Source tracing on a real sewer network
The same question on the real Bellinge network in Denmark (about 1,000 manholes, run in EPA SWMM): how often the engine finds the right manhole, and how much a few well-placed sensors help.