The log is a list of intervals (from and to, in metres) with a lithology code, a description, the drilling time per metre and whether the ground was wet, followed by the water strikes and the construction. The checks are the ones a supervising hydrogeologist makes on site: gaps and overlaps in the log, the log against the final depth, water marked without a strike, screens below the bottom of the hole, above the rest water level, in ground that gives little water or far from every strike, casing that stops above the end of the soft ground, a sanitary seal under 3 m, and conductivity above 2,500 µS/cm.
When the borehole belongs to a groundwater project, the log is compared with the geophysical survey: the depth where hard rock was met against the sounding's prediction, the first water strike against the predicted water-bearing ground, and a warning when the planned depth is reached without water. The printed sheet follows the same fields, so a paper log is typed in without guessing.
By KAI Water & Energy (Kampala, Uganda). Reviewed 17 November 2026. A first look for planning: a hydrogeologist confirms every drilling decision.