Drawdown is the water level during pumping minus the rest level. The Cooper–Jacob line is fitted by least squares to drawdown against the logarithm of time, starting on the later part of the test and moved on until u = r²S/(4Tt) is below 0.05; its slope gives T and its crossing of zero drawdown gives S for an observation borehole. The Theis curve is fitted to the logarithm of drawdown with the Nelder–Mead method on log T and log S, and used for an observation borehole when it fits within a few centimetres. Recovery readings with t/t′ up to 20 give T from the Theis recovery line.
The safe rate carries the drawdown at the end of the test forward on the straight-line slope to a year of continuous pumping, keeps it within 70 % of the water above the pump intake, and never exceeds 1.5 times the rate tested. A late slope more than 1.5 times the earlier one is flagged as a probable boundary, and less than 0.6 times as recharge or leakage.
It assumes a confined aquifer of even thickness, spreading without limit, pumped at a constant rate (Theis, 1935). Fractured, layered or leaky aquifers depart from it; the checks say when the readings show it. Everything runs in the browser.
By KAI Water & Energy (Kampala, Uganda). Reviewed 28 November 2026. A first look for planning: a hydrogeologist confirms every drilling decision.